Ensuite bathroom design & installation
Ensuites are one of the trickiest bathrooms to design well — the space is tight, the plumbing constrained, and every fixture needs to earn its place. Get it right and an ensuite becomes the most-used and best-loved room in the house.
We've designed and installed hundreds of ensuites across Aberdeen — new-builds in Cove and Newhills, luxury master ensuites in Cults and Milltimber, and bedroom conversions in Rosemount and Mannofield tenements.
Making small ensuites feel bigger
Wall-hung sanitaryware, sliding-door shower enclosures, large-format tiles running in the direction of longest sightline, and warm LED-lit mirrors — these are the moves that make a compact ensuite feel expansive. Every ensuite we design includes a considered lighting plan and thoughtful storage.
Why choose us
Space-efficient design
3D CAD visuals to maximise every inch.
Wall-hung sanitaryware
Frees up visual floor space in compact ensuites.
Bedroom conversions
We handle joinery and stud walls for new ensuites.
Quality shower valves
Reliable thermostatic showers from Grohe and Hansgrohe.
Compact luxury
High-end feel even in the smallest ensuite.
Fast install
Most ensuites complete in 6–10 working days.
Frequently asked questions
How much does an ensuite cost in Aberdeen?+
A fitted ensuite in Aberdeen typically costs £2,800 to £4,800. Luxury ensuites with walk-in showers, feature tiling and underfloor heating usually sit between £5,000 and £9,000.
How small can an ensuite be?+
We've fitted comfortable ensuites in spaces as tight as 1.4m × 1.8m using wall-hung sanitaryware, sliding shower doors and compact 800×800 enclosures. Clever design makes small ensuites feel much larger than they are.
Can you add an ensuite to an existing bedroom?+
Yes — this is one of the most popular projects we take on across Aberdeen. We plan the plumbing route, handle any joinery to create the partition wall, and install the full ensuite.
How long does an ensuite install take?+
New-build ensuites take 6–8 working days. Ensuite conversions from unused space take 10–15 days depending on plumbing and structural work.
What sanitaryware works best in small ensuites?+
Wall-hung toilets and vanities, sliding-door quadrant showers, and short-projection basins. These free up visual floor space and make the room feel bigger.