One trusted team for kitchen and bathroom
When you renovate both kitchen and bathroom together, the economics improve significantly — the same tradespeople are on site, tiling and joinery are already scheduled, and you condense the disruption of two projects into one.
We handle the full combined project — kitchen design and supply, bathroom design and supply, all trades in-house, one project manager, one fixed written price.
How combined projects run
We usually stagger kitchen and bathroom work by a week or two so at least one room stays functional. Weeks 1–3 might be kitchen; weeks 3–5 bathroom; overlaps for plumbing, electrics and tiling scheduled centrally.
Why choose us
Combined project saving
Typically 10–15% versus separate jobs.
One project manager
Single point of contact from design to handover.
Kitchen & bathroom trade discount
Passed straight through to you.
Sequenced tightly
Rooms staggered to reduce disruption.
Fixed-price contracts
One agreed price, in writing.
Same aftercare
Written guarantee on both installations.
Frequently asked questions
Is it better to do kitchen and bathroom together?+
Often yes — plumbing, tiling and joinery trades are already on site, so combined projects can save 10–15% versus running them as separate jobs. Living disruption is condensed into one period rather than two.
How much does a combined kitchen and bathroom cost in Aberdeen?+
Combined kitchen and bathroom installations in Aberdeen typically cost £14,000 to £28,000 depending on kitchen size, bathroom spec and any layout changes.
How long does the combined project take?+
Typically 4–6 weeks. We sequence trades tightly so bathroom and kitchen aren't out of use at the same time wherever possible.
Can you supply the kitchen too?+
Yes — we supply full kitchens from quality UK cabinetry brands, plus worktops in quartz, granite or laminate, integrated appliances and all associated works.